projectsensible.eu image: Systems testing at Evora

Laboratory integration tests at the Évora Demonstrator

posted in: News | 0

In July 2017, integration tests of the grid equipment that will be installed in the low voltage grid of Évora Demonstrator were conducted by EDP, INESC TEC, USE, GPTech, EFACEC and Siemens S.A.

The goal of these tests was to bring together the stakeholders of Évora demonstrator to perform all the necessary tests between all systems, with the objective of minimising the risk in the implementation of Évora’s demonstrator and to ensure its success. Potential problems were highlighted with a view to tackle them before systems integration.

Leave a Reply

Your email address will not be published. Required fields are marked *